Interface schedule
Mechanical datum, services, I/O, network and ownership boundaries documented.

Connect the feeder, bulk supply, inspection, buffer and machine demand through a clear mechanical, electrical and control interface.
Reliable feeding depends on coordinated states: the sorter must know when the track is full, the machine must know when a part is available, and both systems need defined responses to starvation, jam, reject and access events.
Mechanical datum, services, I/O, network and ownership boundaries documented.
Ready, run, demand, low-level, full, fault and reset states defined.
Sensors, timeouts and HMI messages structured around operator recovery.
Access, interlocks, emergency stops and machine boundaries reviewed together.
Confirm the downstream cycle and part-request sequence.
Fix the discharge datum, available envelope and service points.
Define buffer capacity and response to short machine stops.
Create the I/O or network handshake and fault matrix.
Integrate guarding, access and safety interfaces into the cell concept.
Technical decisions should be based on the normal production condition, including component variation, surface finish, contamination, product changeovers and the actual receiving machine.

Yes. The interface can use hardwired I/O or an agreed industrial network, subject to the available hardware, customer standard and access to the relevant machine controls.
Common signals include run permission, demand, downstream ready, feeder ready, low level, track full, fault, reset and emergency-stop status. The exact schedule is application-specific.
Yes. A local controller and HMI can manage recipes, speeds, sensor status, diagnostics and maintenance functions.
Bulk level sensing, controlled replenishment, track buffering and early low-part alarms are combined so the process has time to recover.
Responsibilities must be agreed contractually. The integrator can provide design and safety information for the supplied scope, while the party placing the complete machine or assembly into service must ensure the overall conformity process is completed.
Send a part photo or drawing, the target rate and the required orientation. We will recommend the most suitable starting point.